Products

Home  ›  Products

Product Range

Hardware components, built to your drawing

Six product lines under one roof — from standard hinges and handles to fully custom stamped and die-cast parts. Send a drawing and you have a costed quote within 48 hours.

At a glance

6 product lines · MOQ from 500 pcs · ±0.05 mm tolerance · 15–25 day lead time

What We Make

Pick a line, or send your own drawing

Every line below is produced in-house with its own tooling, so mixed orders can ship together on one set of export documents. Dimensions, material and finish are confirmed in writing before tooling starts.

Photo · Hinges

Hinges

Hinges & Pivot Fittings

Cold-rolled steel and 304/316 stainless hinges for cabinets, enclosures and HVAC panels. Concealed, adjustable and pivot types, salt-spray tested to 500 hours.

Steel · SS304 · SS316

Photo · Handles

Handles

Handles & Pulls

Aluminium, zinc and stainless pulls in bar, bow and recessed styles. Powder coating in any RAL colour, plus anodising and brushed finishes.

Aluminium · Zinc · Stainless

Photo · Brackets

Brackets

Brackets & Connectors

Laser-cut and formed brackets with PEM inserts, plus welded or riveted sub-assemblies. Flat patterns and bend radii reviewed before tooling is cut.

±0.1 mm · 1.5–6 mm sheet

Photo · Fasteners

Fasteners

Fasteners & Screws

DIN, ANSI and JIS standard screws and bolts, plus cold-headed specials from your drawing. Property class 8.8 to 12.9 with zinc or black oxide plating.

DIN / ANSI / JIS · M2–M12

Photo · Stamping

Stamping

Stamped Metal Parts

Progressive and compound dies up to 160 T, with tooling made in our own shop. Suits high-volume brackets, clips, contacts and housing shells.

Up to 160 T · 0.3–6 mm

Photo · Castings

Castings

Castings & Die-Cast Parts

Zinc and aluminium die castings from 10 g to 3 kg, with CNC finishing, tumbling and plating. Tooling typically 25–35 days from drawing release.

Zinc · Aluminium · 10 g–3 kg

Buying From Us

The four things buyers ask first

MOQ

From 500 pcs per size on standard parts. Lower quantities possible from stock — ask before you plan the order.

Samples

First article in 10 days, shipped with an inspection report and a material certificate.

Lead Time

15–25 days after sample approval. The date is written on the PO, not just promised by email.

Documents

Material cert, RoHS/REACH report and AQL 2.5 inspection record on every shipment.

Not sure which line your part falls under?

Send the drawing anyway. We route it to the right engineer and tell you which process gives you the lowest landed cost.

滚动至顶部